Contract 21787 REL 1: 200500200 - LOWER GRANITE DAM ADULT TRAP IMPROVEMENTS
Project Number:
Title:
Lower Granite Dam Adult Trap Operations
Stage:
Implementation
Area:
Province Subbasin %
Basinwide - 100.00%
Contract Number:
21787 REL 1
Contract Title:
200500200 - LOWER GRANITE DAM ADULT TRAP IMPROVEMENTS
Contract Continuation:
Previous: Next:
n/a
  • 21787 REL 10: 2005-002-00 EXP LOWER GRANITE DAM ADULT TRAP IMPROVEMENTS - NWW
Contract Status:
Closed
Contract Description:
Project No. 2005-002-00, Design and Construction of Lower Granite Dam Adult Trap Improvements, is an action committed to by the Action Agencies in the Final Updated Proposed Action published on November 24, 2004, and included in the NOAA Fisheries 2004 remand Columbia River Power System Biological Opinion published on November 30, 2004.  The Corps of Engineers, Walla Walla District, expects to complete the trap improvements, using a design/build subcontractor, by mid-March 2007, prior to the start of the 2007 fish collection season .

The adult trap at Lower Granite Dam was designed and constructed more than 25 years ago during a period when anadromous fish adult returns were at very low numbers.  Fall Chinook salmon returns, for example, were only 1,000 in 1975 compared to 16,000 in 2002.  The current trapping facilities do not have the capacity to meet the present requirements for hatchery broodstock collection, removal of non-ESU stray fall Chinook, and research activities.  The adult trapping and holding facilities will be modified to allow trapping and handling of up to approximately 6,000 adult fall Chinook salmon annually.  Anticipated modifications include increased working space, an additional anesthetic tank, improved water supply, and increased number of adult holding tanks.  

This action is expected to:  1. Reduce risks to the ESU by improving hatchery practices (i.e., being able to collect and use natural-origin fish for broodstock will improve the integration between natural-origin and hatchery-origin fall Chinook salmon).  2. Jumpstart production in underutilized areas of the Clearwater Basin by using natural-origin fish collected at the trap.  3. Reduce risks to the ESU from atypical straying of hatchery-origin fish from areas outside the Snake River Basin (i.e., increased trapping capability would facilitate the removal of greater numbers of stray fish). 4.  Improve data collection and understanding of ESU status (e.g., improved run-reconstruction).

Environmental Compliance was completed by BPA in Fiscal Year 2006.
Account Type(s):
Capital
Contract Start Date:
03/04/2005
Contract End Date:
12/31/2007
Current Contract Value:
$2,050,967
Expenditures:
$2,050,967

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Jan Brady Bonneville Power Administration Yes COR jebrady@bpa.gov (503) 230-4514
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Jan Poolman US Army Corps of Engineers (COE) No Administrative Contact janice.d.poolman@usace.army.mil (509) 527-7351
Karen Robison US Army Corps of Engineers (COE) Yes Contract Manager karen.k.robison@usace.army.mil (509) 527-7614
Nancy Weintraub Bonneville Power Administration No Env. Compliance Lead nhweintraub@bpa.gov (503) 230-5373


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 175 Prepare engineering drawings, specifications, and cost estimate
B 174 Produce Project Management Plan
C 165 Environmental compliance for trapping facility modifications
D 141 Produce Milestone Reports
E 119 Manage Lower Granite Dam adult trap improvements project
F 185 Quarterly Status Reports